So as mentioned in another thread, we were having issues with the engine and trans combo lining up with their proper holes. I ended up pulling the C channel bracket for the trans mount and stuck it in the Iron Worker and slotted the holes. Everything lines up great now.
[IMG]http://www.ifsja.org/forums/vb/

[/IMG]
Since we're still waiting for parts to show up, we decided to take the junk yard gas tank skid and modify it to fit this Jeep. I have no idea what year this skid came from but my frame had no holes so holes need to be drilled. Since we're modifying it, I decided to do it my way and shrink the overall size of the skid to fit the MTS tank and get rid of excess steel. We then created "walls" to box in the skid to make it stronger. Since the bottom was .125, we used .125 for the walls as well. We're not done yet but should be done tomorrow. Cut the skid down, create walls to box it in, create new mounts....It's all good when you have a CNC plasma machine laying around.
[IMG]http://www.ifsja.org/forums/vb/

[/IMG]
[IMG]http://www.ifsja.org/forums/vb/

[/IMG]
[IMG]http://www.ifsja.org/forums/vb/

[/IMG]